Upgraded Drainage System, Stone Wall and Road Surface Will Enhance Safety and Harden Key Roadway Against Severe Weather Impacts
Governor Kathy Hochul today announced that work has begun on a $26.3 million project to enhance safety and improve resiliency along a 4.9-mile stretch of U.S. Route 9W atop Storm King Mountain in the Towns of Cornwall and Highlands, Orange County. The project will upgrade drainage systems, fortify stone walls, replace concrete barriers and resurface the road to improve travel conditions and help this vital roadway better withstand the impacts of severe weather. This stretch of the scenic highway, located between Newburgh and Bear Mountain on the western side of the Hudson River, serves as an important access road for the U.S. Military Academy at West Point and many other popular attractions in the Hudson Valley region.
“New Yorkers need only look at the significant damage done to our roads and bridges by severe storms in recent years to know that climate change is already having an impact and we need to be ready,” Governor Hochul said. “This resiliency project along U.S. Route 9W in Orange County exemplifies our Build-it-Back-Better mantra and will mitigate persistent drainage issues on this important Orange County roadway, ensuring its long-term ability to withstand the growing challenges posed by mother nature.”
A key focus of the project will be the installation of 6,700 linear feet of perforated pipe, known as an underdrain, that is designed to collect and redirect subsurface water before it saturates the road surface. Additionally, 12,300 feet of asphalt gutter will be constructed, and existing drainage structures will be repaired to better channel surface water runoff and prevent ponding.
Deteriorating sections of the 88-year-old stone wall located along the eastern, or cliff side, of the roadway will be rebuilt and strengthened using a concrete barrier placed on a structurally integrated concrete slab. Where possible, salvaged stones from the existing wall will be repurposed as stone veneer, seamlessly blending the aesthetics and keeping a similar appearance. Additional portions of the existing wall will also be repaired and repointed, where necessary.
The roadway will be resurfaced using warm-mix asphalt – which utilizes less energy to produce than traditional asphalt – and high-visibility pavement markings and reflectors on barriers will be installed to enhance safety, especially during nighttime driving conditions. Additionally, about 10,000 linear feet of concrete median barrier will be replaced and equipped with new impact attenuators, substantially mitigating crash risks.
During construction, traffic will be reduced to one lane in each direction to allow for construction activities, which will be complete in Spring 2026.
No comments:
Post a Comment